Solar Case Studies & Regional Projects
Real installations deployed across Malda (Head Office), Siliguri, Uttar Dinajpur, Dakshin Dinajpur, and all 23 districts of West Bengal since 2007.
15+ MW
Total Deployed Capacity
450+
Completed Installations
23 Districts
West Bengal Coverage
18,500 T
CO2 Emissions Avoided
120 kWp Commercial Solar
Year: 2024
120 kWp Cold Storage & Mango Processing Solar Power Plant
Client: Mahananda Agri-Food & Cold Storage Ltd.
Turnkey on-grid rooftop solar plant powering high-capacity cold chain compressors and mango pulp processing machinery. Generating ~1,68,000 units annually and reducing peak WBSEDCL commercial power expenses by over ₹13.4 Lakhs every year.
5 kW On-Grid System
Year: 2024
5 kW Residential Rooftop Solar Plant (PM Surya Ghar)
Client: Er. S. K. Mukherjee & Family
South-facing RCC rooftop solar system with bi-directional net-metering commissioned under WBSEDCL Malda Division. Full ₹78,000 central DBT subsidy disbursed within 28 days. Reduced monthly power bill from ₹5,800 to under ₹350/month.
80 kWp Rooftop Solar
Year: 2024
80 kWp Rooftop Solar EPC for Multi-Specialty Hospital
Client: North Bengal Healthcare & Diagnostic Centre
Elevated heavy-gauge galvanized structure engineered for foothills wind resistance. Powers critical diagnostic equipment, intensive care lighting, and central HVAC, shielding the medical facility from tariff hikes and saving ~₹8.8 Lakhs annually.
45 kWp Grid-Tied System
Year: 2023
45 kWp Commercial Complex & Logistics Hub
Client: Hill View Commercial Complex & Logistics Hub
Tier-1 monocrystalline half-cut cell solar installation covering 4,200 sq.ft of warehouse roof. Equipped with real-time cloud SCADA telemetry, supplying clean daylight energy to retail showrooms, cold rooms, and EV charging points.
60 kWp Solar EPC + 15 HP Pumps
Year: 2024
60 kWp Agri-Processing & Automated Solar Pumping Cluster
Client: Kulick Valley Agro Industries & Farmers Cooperative
Integrated solar agro-infrastructure powering high-efficiency agricultural tube-wells and modern rice processing mills across 250+ acres. Completely eliminates agricultural diesel dependency for over 85 local smallholder farmers.
50 kWp Rooftop Solar
Year: 2024
50 kWp Institutional Campus Rooftop Solar EPC System
Client: Dakshin Dinajpur Educational & Technical Campus
Grid-connected institutional rooftop solar installation providing green educational credentials and 100% daylight energy autonomy for computer laboratories, smart classrooms, and faculty residential blocks.
35 kW Solar RO Plant
Year: 2023
35 kW Community Solar Mini-Grid & Drinking Water Facility
Client: Gangarampur Gram Panchayat & Jal Jeevan Mission
Decentralized rural solar micro-grid powering a 10,000 Liter/day reverse osmosis community drinking water station and street light network. Provides reliable potable water to 420 rural households with zero carbon emissions.